4x HD Quality

Using cutting edge SLR cameras, we take still images that far exceed HD and stitch them into a pristine film to your requirements.

This allows us to pan, zoom and edit during post production to focus on the parts of the image you need during key time periods.

Remote Management

All projects are remotely monitored and managed from our HQ ensuring the highest possible uptime.

Picture interval can be adjusted at any time throughout the project, as well as regular video files produced.

Secure & Reliable

Every image is backed up across multiple drives in different geographical locations ensuring no risk of loss of images.

All of our installations are done by fully qualified CSCS, IPAF certified engineers with years of experience in their field.

Installation & Management

A thorough consultation of the requirements of your project, together with a besoke solution from our engineers to ensure the correct images are captured. Incorporating everything from long range wireless, battery powered, remote locations, to short term filming with a photographer on the ground.

+

Production & Marketing

Liason with our video editing team to create a production with the look and feel that can showcase your project to the upmost. Including in-house written music, multiple camera angles and still photos; all bought together in a fluid and stunning video to be showcased on websites, social media, mobile or DVD.

=
  • A unique and eye-catching marketing piece;
  • A complete documentation of your whole project;
  • An easily promotable tool that can be shared;
  • A way for all parties to reflect on progress;
  • A tool to illustrate to shareholders;
  • RECENT WORK

    This showcases some of our recent work; both long and short term

    View all of our projects here →
  • Lenton Lane Bridge Launch

    A short term (24 hours) timelapse of a bridge move into position - a key milestone in the tram system extention for Nottingham.

  • The Hub Project

    Long term documentation of the Nottingham Train Station redevelopment that plans to make it the centre of transport for the local area.

  • Concourse Redevelopment

    A project that overlooks the entire redevelopment of Nottingham Train Stations integration with the tram system, and train platform works over the next 9 months.

CONTACT DETAILS

Inside Out Timelapse Productions
190 North Gate, Basford, NG7 7FT
Tel: 0115 9791719
Email: info@insideoutgroup.co.uk
We on Maps

Paul C. Harris, Taylor Woodrow Alstom Programme Director

The engineering design and construction excellence of the new ‘Karlsruhe Friendship Bridge’ has been matched by your teams’ fantastic video that has left us all in a wonderful state of ‘awe and wonderment’. I am sure that in the coming days, weeks and months our combined teams together with the people of Nottingham will proudly watch this film to marvel at both the bridge engineering and your film. Equally the fantastic storyboard video images are complimented by the unique and original construction site musical score.

Roger Harrison, Chairman, Tramlink Nottingham Ltd

Inside Out Time Lapse Productions produced time lapse films both for the first section of the new tram Karlsruhe Friendship Bridge at the main Nottingham station and for the new tram bridge at Lenton Lane. They were of excellent quality and have added greatly both to our marketing material and they are a great record of these important events.

Alistair Baker, Balfour Beatty Civil Engineering Ltd

A good team – they complement each other.

Scroll to top